ParkBench
ParkBench · Philo Labs

Can an AI run a theme park for two years?

10 frontier models each run the same RollerCoaster Tycoon park for 16 simulated months (two March–October seasons), in OpenRCT2, the open-source version of the game with real ride physics and business logic.

Why it’s hard: it is spatial and operational at once. The owner reads a 3D canyon from images and has to lay paths and coaster track that fit the terrain and actually connect; one dead end can gridlock thousands of guests. Meanwhile it runs a business: cash, loans, prices, staff, breakdowns, the press, and a board that audits its reports.

Six of ten models met the goal. Claude Fable 5.2 finished first on company value ($420K); Gemini 4 Carbon drew the most guests (3,309) and came second ($281K); Gemini 4 Argon, GPT-6 Astra and Gemini 4 Hydrogen also made it. They got there as very different owners: Fable works out the game’s rules and runs every marketing campaign it can, Carbon is a showman that hires 49 entertainers and builds 12 coasters, Argon is a workaholic that hires an army of staff, Astra is a careful accountant that writes itself spending rules, and DeepSeek Flash keeps its gate at $4 and never starts a coaster.

Owners

10 models
best of 3 runs each

World

OpenRCT2 v0.5.7
headless, deterministic

Park

Canyon Run
16 simulated months

Published

November 9, 2026

Claude Fable 5.2's park
Claude Fable 5.2✓ objective met
Gemini 4 Carbon's park
Gemini 4 Carbon✓ objective met
Claude Opus 5.5's park
Claude Opus 5.5✓ objective met
Gemini 4 Argon's park
Gemini 4 Argon✓ objective met
GPT-6 Astra's park
GPT-6 Astra✓ objective met
Gemini 4 Hydrogen's park
Gemini 4 Hydrogen✓ objective met
Claude Sonnet 5.5's park
Claude Sonnet 5.5✗ objective missed
Muse Wonder's park
Muse Wonder✗ objective missed
DeepSeek Flash's park
DeepSeek Flash✗ objective missed
Claude Haiku 5.5's park
Claude Haiku 5.5✗ objective missed
Every park on the same game date, every two weeks of game time. Each image is the whole-park render that owner received as input at the start of each decision, cropped to the area the owners built on (same crop for everyone). Live numbers are guests in park, park rating and cash. Order follows the leaderboard.

Findings

  • A park is only as good as the walk through it (Spatial)Claude Opus 5.5 laid its park out along one path from the gate into a single north–south “spine” with rides on both sides. By late May Y1 that spine was jammed, and Opus saw why in its notebook: “Paths are single width; spine x18 is bottleneck → ‘too crowded’ top thought. Consider second spine / more spread-out attractions.” For the rest of the run it pushed new paths north and east and put each new coaster at the far end, so guests had somewhere to walk to. Where a ride sits mattered as much as what it is: three gentle rides tucked inside a coaster’s loop had no riders after two weeks, and two pirate ships in far corners drew 22 and 6. DeepSeek Flash never got that far. It built seven food and drink stalls, and not one of them had a single customer in sixteen months: guests could not reach them. A jam at Restroom 1 made the press four times, and guests kept thinking they could not find the exit. A board member summed up September Y1: “Crowding … and lost guests are the core problem, not a lack of rides.” By the end 333 of DeepSeek’s 372 guests were lost.
  • The most work is not the most money (Operational)Gemini 4 Argon was the busiest owner: 3,962 park commands, nearly three times as many as Claude Opus 5.5 (1,418). Week after week it checked the map one square at a time (1,581 times), changed prices (131 times) and hired more staff (79). Opus checked single squares only 195 times and spent its commands building. It did less and earned more: $272K company value and $68K cash, against Argon’s $187K and $36K. Muse Wonder was busier still (4,209 commands), and most of that was looking rather than building: 2,368 single-square checks, against 452 for GPT-6 Astra. In its best run it went twelve straight weeks without building anything, and it finished at $47K.
  • Mistakes surface months later (Delayed consequences)Sixteen months is long enough for early choices to come due. Claude Sonnet 5.5’s paths were losing guests from its first month (about 100 lost by the end of March Y1), yet its rating stayed above 600 for a year and a half. Only when the park filled up in September Y2 did its rating fall from 822 to 0, eight weeks before the deadline. Good choices compound the same way: Claude Opus 5.5 crossed 1,200 guests a year early, then grew its cash from $8K at the end of the first season to $68K at the end of the second. The world amplifies both: the board capped DeepSeek Flash’s construction in 11 of its 15 meetings and its word of mouth fell to ×0.87, so fewer guests were sent to a park that was already failing.

Owner personalities

Each model played the same game, but they ran very different businesses. Traits are computed from what each owner actually did; quotes are its own words from its reasoning or its notebook. Images show each park at the end.

Claude Fable 5.2's park at turn 87

Claude Fable 5.2

The economist. Worked out the game's guest-arrival rules in its notebook, renewed every marketing campaign it could for a year and a half, raised the gate fee to $70 in six weeks, and hit 1,200 guests in June of Year 1.
Built
1 coaster (5 started) · 61 flat rides · 17 shops · 10 facilities
Best coaster
Mine Train Coaster 1 (excitement 5.26)
Gate fee
$8–$75 · 9 changes
Debt
peak loan $15,000 · 0 board requests · ends at $0
Looking
129 extra images (111 top, 18 3d)
Tempo
a decision every 5.6 days · 23 commands each
Rejected
1% · top: Raise or lower land first
Staff
47 handyman, 21 entertainer, 12 mechanic
Marketing
$42,000
guests over the run
“CROWDING: "too crowded" fires when >=10 WALKING guests on one tile. … Any new ride MUST come with queue tiles in a NEW area.”notebook · May 30, Y2
“Won't fire staff / raise fee / defer costs / buy ads to force a target. A miss is reported as a miss.”notebook · Oct 29, Y2
Gemini 4 Carbon's park at turn 85

Gemini 4 Carbon

The showman. Hired 49 entertainers, built 12 roller coasters including the most exciting ride on the leaderboard (excitement 5.61), and drew 3,309 guests, the most of any owner, while spending nearly everything it earned to get there.
Built
12 coasters (28 started) · 17 flat rides · 80 shops · 24 facilities
Best coaster
Spiral Roller Coaster 1 (excitement 5.61)
Gate fee
$12–$60 · 8 changes
Debt
peak loan $15,000 · 0 board requests · ends at $0
Looking
330 extra images (304 top, 25 3d, 1 3d_back)
Tempo
a decision every 5.8 days · 50 commands each
Rejected
1% · top: Raise or lower land first
Staff
49 entertainer, 26 handyman, 12 mechanic
Marketing
$35,850
guests over the run
Claude Opus 5.5's park at turn 91

Claude Opus 5.5

The builder. Put up 15 roller coasters, hit 1,200 guests a full year early, then raised the gate fee to $95 to thin the crowds and earn more per guest, and finished with $68K in the bank.
Built
15 coasters (17 started) · 18 flat rides · 23 shops · 7 facilities
Best coaster
Spiral Roller Coaster 1 (excitement 3.76)
Gate fee
$12–$95 · 11 changes
Debt
peak loan $25,000 (Jun 3, Y1) · 4 board requests (2 partial) · ends at $25,000
Looking
117 extra images (102 top, 15 3d)
Tempo
a decision every 5.4 days · 16 commands each
Rejected
2% · top: Raise or lower land first
Staff
37 handyman, 8 mechanic, 7 entertainer
Marketing
$2,100
guests over the run
“I'm settling on the bottom banked turn as the likely culprit, since its speed is high enough to produce roughly 4g even with banking.”reasoning summary · Mar 13, Y1
“I'm settling on a fee of $95 for now, since guests at around 1,383 leave plenty of margin above the 1,200 target and a higher price should bring in more income.”reasoning summary · Apr 30, Y2
Gemini 4 Argon's park at turn 74

Gemini 4 Argon

The workaholic. Almost never decided it was done, hired an army of handymen and entertainers, and paid off its loan before the end.
Built
6 coasters (11 started) · 14 flat rides · 27 shops · 10 facilities
Best coaster
Mine Train Coaster 1 (excitement 4.96)
Gate fee
$12–$40 · 4 changes
Debt
peak loan $15,000 · 0 board requests · ends at $0
Looking
148 extra images (127 top, 15 3d, 6 3d_back)
Tempo
a decision every 6.6 days · 54 commands each
Rejected
1% · top: Footpath in the way
Staff
33 entertainer, 30 handyman, 10 mechanic
Marketing
$24,200
guests over the run
“Never `unpath` tiles with guests on them: Stranding guests on bare ground causes "I'm lost" thoughts and hurts rating/reviews.”notebook · Sep 15, Y1
“All 20 rides open with no breakdowns; 1,644 guests in park (vs 1,200 scenario goal and 1,500 board target), 961/999 park rating, $36,572 cash ($0 loan), and $7,823 October operating profit with $0 construction.”end-of-turn note · Oct 29, Y2
GPT-6 Astra's park at turn 87

GPT-6 Astra

The careful accountant. Wrote itself spending rules, won three awards, and crossed the line last of the six finishers, still climbing.
Built
9 coasters (10 started) · 5 flat rides · 11 shops · 4 facilities
Best coaster
Spiral Roller Coaster 1 (excitement 4.98)
Gate fee
$12–$30 · 5 changes
Debt
peak loan $17,000 (Aug 4, Y1) · 3 board requests (1 approve, 1 deny) · ends at $16,000
Looking
178 extra images (117 top, 60 3d, 1 3d_back)
Tempo
a decision every 5.6 days · 24 commands each
Rejected
1% · top: Raise or lower land first
Staff
23 handyman, 5 mechanic
Marketing
$1,100
guests over the run
“Estimated attraction capacity is still only about 1,070, so I’ve surveyed a northern site for a smaller, cash-funded expansion toward October’s 1,200-guest goal.”visible reply · May 20, Y2
“I’ll leave the working layout intact rather than force a risky alteration.”visible reply · Aug 1, Y2
Gemini 4 Hydrogen's park at turn 73

Gemini 4 Hydrogen

The steady operator. Kept the gate at $35, built eight coasters, and crossed 1,200 guests in March Y2, then saw lost guests jump from 50 to 334 in three summer weeks and spent its last two months winning the count back to 1,443.
Built
8 coasters (22 started) · 9 flat rides · 18 shops · 8 facilities
Best coaster
Spiral Roller Coaster 1 (excitement 5.51)
Gate fee
$12–$35 · 4 changes
Debt
peak loan $15,000 · 2 board requests (1 partial) · ends at $11,000
Looking
297 extra images (185 top, 112 3d)
Tempo
a decision every 6.7 days · 54 commands each
Rejected
1% · top: Raise or lower land first
Staff
36 handyman, 18 mechanic
Marketing
$6,300
guests over the run
Muse Wonder's park at turn 71

Muse Wonder

Lost in the details. Probed the map one square at a time, built just two coasters, and ended with half its guests lost and the gate fee cut to $3.
Built
2 coasters (2 started) · 18 flat rides · 6 shops · 3 facilities
Best coaster
Spiral Roller Coaster 1 (excitement 2.31)
Gate fee
$3–$16 · 5 changes
Debt
peak loan $15,000 · 0 board requests · ends at $15,000
Looking
141 extra images (113 top, 28 3d)
Tempo
a decision every 6.9 days · 59 commands each
Rejected
1% · top: Footpath in the way
Staff
14 handyman, 8 mechanic, 1 entertainer
Marketing
$2,450
guests over the run
DeepSeek Flash's park at turn 71

DeepSeek Flash

The penny-pincher. Never started a coaster, kept the gate at $4, spent nothing on marketing, and let its paths cut guests off from the exit: by the end 333 of its 372 guests were lost.
Built
0 coasters (0 started) · 8 flat rides · 8 shops · 2 facilities
Best coaster
—
Gate fee
$4–$12 · 2 changes
Debt
peak loan $15,000 · 0 board requests · ends at $15,000
Looking
129 extra images (106 top, 20 3d, 2 iso)
Tempo
a decision every 6.9 days · 54 commands each
Rejected
3% · top: Footpath in the way
Staff
4 mechanic, 2 handyman
Marketing
$0
guests over the run
“Alternative bigger strategy: Since the layout is a mess (rides overlapping paths, 5 gentle rides in the south zone, low excitement), maybe I should accept the mess but fix connectivity with targeted paths, and focus investment…”reasoning summary · Mar 29, Y1
“Actually — since a big part of the trouble is the plaza is a rat's nest, maybe I should consider a cleaner strategy: demolish the 5 badly placed stalls in the north plaza and rebuild fresh stalls in clean positions beside paths,…”reasoning summary · May 5, Y2
More owners (2)
Claude Sonnet 5.5's park at turn 88

Claude Sonnet 5.5

The target-chaser. Crossed 1,200 guests in September Y2, then watched its rating fall from 822 to 0 in the last eight weeks while it guarded the guest count with an ad and free entry.
Built
2 coasters (3 started) · 25 flat rides · 12 shops · 7 facilities
Best coaster
Mine Train Coaster 1 (excitement 2.33)
Gate fee
$0–$35 · 13 changes
Debt
peak loan $15,000 · 2 board requests (2 deny) · ends at $15,000
Looking
110 extra images (99 top, 11 3d)
Tempo
a decision every 5.6 days · 16 commands each
Rejected
3% · top: Raise or lower land first
Staff
19 handyman, 7 mechanic, 3 entertainer
Marketing
$15,750
guests over the run
“It's Oct 16, the final month, with 1208 guests against a need of at least 1200 by month's end, while the rating sits at 237, far short of 600, so guests are the thing to protect.”reasoning summary · Oct 16, Y2
“I'm weighing whether the rating of 0 can be fixed in the single day left, and I'm inclined to think it's a data quirk rather than something I can repair quickly.”reasoning summary · Oct 31, Y2
Claude Haiku 5.5's park at turn 93

Claude Haiku 5.5

The optimist. Cut entry to $0 in its first month, assumed its lost guests had “just arrived”, and never got them to its stalls: by the end 327 of its 337 guests were lost and the company was worth less than nothing.
Built
1 coaster (5 started) · 3 flat rides · 14 shops · 1 facilities
Best coaster
Spiral Roller Coaster 1 (excitement 0.25)
Gate fee
$0–$12 · 17 changes
Debt
peak loan $16,400 (Oct 8, Y2) · 3 board requests (1 approve, 1 partial) · ends at $16,400
Looking
217 extra images (121 top, 95 3d, 1 3d_back)
Tempo
a decision every 5.3 days · 34 commands each
Rejected
3% · top: Must be closed first
Staff
none
Marketing
$0
guests over the run
“Many guests still show as "lost," probably because they just arrived, and that may ease once the paths are fully linked.”reasoning summary · Mar 22, Y1

Leaderboard

Ranked by company value at the end (park value + cash − loan). Bars are scaled within each column.

#OwnerObjectiveGuests (end)RatingCompany valueCashRidesPark commandsExtra images
1Claude Fable 5.2
Anthropic
✓ met
2,872
peak 3,047
999
$420,457
$197,703
loan $0
62
1 coaster
2,007
1% rejected
129
2Gemini 4 Carbon
Google
✓ met
3,309
peak 3,317
999
$281,044
$18,980
loan $0
29
12 coasters
4,220
1% rejected
330
3Claude Opus 5.5
Anthropic
✓ met
1,817
peak 1,819
999
$271,782
$68,436
loan $25,000
33
15 coasters
1,418
2% rejected
117
4Gemini 4 Argon
Google
✓ met
1,643
peak 1,644
973
$186,753
$35,994
loan $0
20
6 coasters
3,962
1% rejected
148
5GPT-6 Astra
OpenAI
✓ met
1,463
peak 1,463
989
$145,861
$12,336
loan $16,000
14
9 coasters
2,107
1% rejected
178
6Gemini 4 Hydrogen
Google
✓ met
1,443
peak 1,443
999
$141,876
$7,231
loan $11,000
17
8 coasters
3,943
1% rejected
297
7Claude Sonnet 5.5
Anthropic
✗ missed
1,220
peak 1,246
0
$105,010
$14,514
loan $15,000
27
2 coasters
1,384
3% rejected
110
8Muse Wonder
Meta
✗ missed
561
peak 561
0
$46,607
$11,376
loan $15,000
20
2 coasters
4,209
1% rejected
141
9DeepSeek Flash
DeepSeek
✗ missed
372
peak 379
0
$410
$3,746
loan $15,000
8
0 coasters
3,859
3% rejected
129
10Claude Haiku 5.5
Anthropic
✗ missed
337
peak 337
271
−$6,086
−$245
loan $16,400
4
1 coaster
3,188
3% rejected
217

Run-to-run variance and cost

Every model ran the same park three times with the same seed. The leaderboard shows each model’s best run; this chart shows all three, against what each run cost in API calls. Ranking by the 3-run average changes only Claude Opus 5.5 and Gemini 4 Carbon (average $212K vs $206K), which swap places. Claude Fable 5.2’s worst run ($321K) still beat Gemini 4 Carbon’s best ($281K).

The dashed line is the Pareto frontier: models where no other model is both cheaper and better on average. Off the frontier: GPT-6 Astra (beaten by Gemini 4 Argon), Gemini 4 Hydrogen (beaten by Gemini 4 Argon), Muse Wonder (beaten by Claude Sonnet 5.5).

−$100K$0K$100K$200K$300K$400K$500K$1$3$10$30$100$200API cost per 16-month run (owner model, log scale)Final company valueClaude Fable 5.2 run 1: $420K company value, 2,872 guests, goal met, $80 API cost (shown on leaderboard)Claude Fable 5.2 run 2: $321K company value, 2,536 guests, goal met, $99 API costClaude Fable 5.2 run 3: $354K company value, 2,713 guests, goal met, $116 API costClaude Fable 5.2 average of 3 runs: $365K company value, $98 per runGemini 4 Carbon run 1: $281K company value, 3,309 guests, goal met, $34 API cost (shown on leaderboard)Gemini 4 Carbon run 2: $168K company value, 1,511 guests, goal met, $28 API costGemini 4 Carbon run 3: $168K company value, 1,549 guests, goal met, $28 API costGemini 4 Carbon average of 3 runs: $206K company value, $30 per runClaude Opus 5.5 run 1: $272K company value, 1,817 guests, goal met, $46 API cost (shown on leaderboard)Claude Opus 5.5 run 2: $187K company value, 1,768 guests, goal met, $40 API costClaude Opus 5.5 run 3: $176K company value, 1,634 guests, goal met, $41 API costClaude Opus 5.5 average of 3 runs: $212K company value, $42 per runGemini 4 Argon run 1: $177K company value, 1,965 guests, goal met, $19 API costGemini 4 Argon run 2: $174K company value, 1,632 guests, goal met, $21 API costGemini 4 Argon run 3: $187K company value, 1,643 guests, goal met, $17 API cost (shown on leaderboard)Gemini 4 Argon average of 3 runs: $179K company value, $19 per runGPT-6 Astra run 1: $146K company value, 1,463 guests, goal met, $44 API cost (shown on leaderboard)GPT-6 Astra run 2: $128K company value, 1,378 guests, goal met, $44 API costGPT-6 Astra run 3: $122K company value, 1,385 guests, goal met, $49 API costGPT-6 Astra average of 3 runs: $132K company value, $46 per runGemini 4 Hydrogen run 1: $123K company value, 1,572 guests, goal met, $19 API costGemini 4 Hydrogen run 2: $142K company value, 1,443 guests, goal met, $19 API cost (shown on leaderboard)Gemini 4 Hydrogen run 3: $111K company value, 1,176 guests, goal missed, $19 API costGemini 4 Hydrogen average of 3 runs: $125K company value, $19 per runClaude Sonnet 5.5 run 1: $68K company value, 839 guests, goal missed, $11 API costClaude Sonnet 5.5 run 2: $105K company value, 1,220 guests, goal missed, $9.6 API cost (shown on leaderboard)Claude Sonnet 5.5 run 3: $98K company value, 1,255 guests, goal missed, $13 API costClaude Sonnet 5.5 average of 3 runs: $90K company value, $11 per runMuse Wonder run 1: $14K company value, 205 guests, goal missed, $28 API costMuse Wonder run 2: $35K company value, 358 guests, goal missed, $30 API costMuse Wonder run 3: $47K company value, 561 guests, goal missed, $29 API cost (shown on leaderboard)Muse Wonder average of 3 runs: $32K company value, $29 per runDeepSeek Flash run 1: $0K company value, 372 guests, goal missed, $2.4 API cost (shown on leaderboard)DeepSeek Flash run 2: −$6K company value, 343 guests, goal missed, $2.5 API costDeepSeek Flash run 3: −$5K company value, 337 guests, goal missed, $2.4 API costDeepSeek Flash average of 3 runs: −$4K company value, $2.5 per runClaude Haiku 5.5 run 1: −$15K company value, 457 guests, goal missed, $1.3 API costClaude Haiku 5.5 run 2: −$9K company value, 372 guests, goal missed, $1.7 API costClaude Haiku 5.5 run 3: −$6K company value, 337 guests, goal missed, $1.5 API cost (shown on leaderboard)Claude Haiku 5.5 average of 3 runs: −$10K company value, $1.5 per runClaude Fable 5.2Claude Opus 5.5Gemini 4 CarbonGemini 4 ArgonGPT-6 AstraGemini 4 HydrogenClaude Sonnet 5.5Muse WonderDeepSeek FlashClaude Haiku 5.5
Small dots are single runs; large dots are 3-run averages, with whiskers spanning the runs on both axes. Cost covers the owner model only. Gemini 4 Carbon’s cost uses Google’s introductory price ($2 / $10 per million input / output tokens, until November 30, 2026); at the list price from December it doubles. Gemini 4 Hydrogen has no published price yet; its cost uses Carbon’s price as a placeholder.
Show all runs as a table
OwnerCompany value, runs 1–3AverageStd. dev.Goal metCost per runPareto
Claude Fable 5.2$420K · $321K · $354K$365K$50K3 of 3$98yes
Gemini 4 Carbon$281K · $168K · $168K$206K$65K3 of 3$30yes
Claude Opus 5.5$272K · $187K · $176K$212K$52K3 of 3$42yes
Gemini 4 Argon$177K · $174K · $187K$179K$7K3 of 3$19yes
GPT-6 Astra$146K · $128K · $122K$132K$12K3 of 3$46
Gemini 4 Hydrogen$123K · $142K · $111K$125K$15K2 of 3$19
Claude Sonnet 5.5$68K · $105K · $98K$90K$20K0 of 3$11yes
Muse Wonder$14K · $35K · $47K$32K$16K0 of 3$29
DeepSeek Flash$0K · −$6K · −$5K−$4K$4K0 of 3$2.5yes
Claude Haiku 5.5−$15K · −$9K · −$6K−$10K$4K0 of 3$1.5yes

Trajectories

One point per decision. Hover or touch to compare owners on the same day.

Claude Fable 5.2Gemini 4 CarbonClaude Opus 5.5Gemini 4 ArgonGPT-6 AstraGemini 4 HydrogenClaude Sonnet 5.5Muse WonderDeepSeek FlashClaude Haiku 5.5
Guests in park

the objective counts guests at the end of October Y2

Park rating

OpenRCT2's 0–999 rating; must be ≥ 600 at the deadline

Company value

park value + cash − loan

Cash

below zero the park is spending money it does not have

Average guest happiness

0–255, from every guest in the park

Guests thinking “It's too crowded here”

share of guests in park

Word of mouth

visitor-demand multiplier from guest reviews and press, applied inside the engine; dashed line = neutral ×1.00

Entrance fee

every owner chose its own pricing

Moments

One episode each from the three owners that met the objective. Each shows the park before and after, the owner's own reasoning at that moment and how the world responded.

before
before · Mar 15, Y2
after
after · May 13, Y2
Claude Opus 5.5 · Mar 22, Y2

Opus raises the gate fee from $23 to $95 in six weeks

By late March Y2 Opus already had 1,397 guests, 197 over the target, and crowding complaints were climbing. Between Mar 22 and Apr 30, Y2 it raised the gate fee $23 → $26 → $30 → $35 → $45 → $60 → $80 → $95, reasoning both ways: fewer arrivals to ease the crowding, and more revenue per guest. Guests drifted from 1,418 (Apr 23, Y2) to 1,304 (May 13, Y2) while the rating rose to 999; it then settled at $60. Opus finished with $68,436 cash.

“Raising the fee from $30 to $40 would thin arrivals slowly while still bringing in more revenue per guest, though it risks guests feeling the park is poor value.”Opus's reasoning, Apr 2, Y2
“Your reporting is accurate and the park is ahead of the October objective. Happiness is the weak spot at 171. … Stay within your ~$10k spending plan, keep the loan at $25,000, and manage the fee so guests stay above 1,250.”Investor board, May 1, Year 2
before
before · Jun 28, Y1
after
after · Oct 29, Y2
Gemini 4 Argon · whole run

Argon never stops working; the tool-call cap stops it

Argon rarely stopped on its own: in 56 of its 74 turns it worked until the 60-tool-call cap cut it off. Over the run it hired 36 handymen, 33 entertainers and 10 mechanics, spent $24,200 on marketing, and on Sep 16, Y2 paid off its loan in full. It crossed 1,200 guests on Apr 16, Y2 and never fell back below.

“Never `unpath` tiles with guests on them: Stranding guests on bare ground causes "I'm lost" thoughts and hurts rating/reviews.”Argon's notebook (Gemini returns no readable reasoning), Sep 15, Y1
“1,534 guests and a 903 rating put us well past the October objective of 1,200 guests and 600 rating. … No CFO report was filed. That is not acceptable, whatever the numbers.”Investor board, September 2, Year 2
before
before · Apr 26, Y2
after
after · May 13, Y2
GPT-6 Astra · May 1, Y2

One missing argument costs Astra its coaster loan

Astra had borrowed up to $17,000 in August Y1 (approved) and was back at $16,000. On May 1, Y2 it wanted just $1,000 more for a costed $3,800 coaster project. Its first command was a bare loan 17000 with no justification, and the board refused it. Its immediate resubmission carried a detailed plan, but the board rules only once per sitting, and Astra never asked again. It still reached 1,463 guests by the deadline, at its peak, with three press awards (Best Value, Safest, Best Roller Coasters).

“I’ll request a limited $1,000 loan increase to fund the planned coaster, subject to the $3,800 project cap and $5,000 cash reserve.”Astra's message, May 1, Y2
“No justification given. Cash of $8,168 already exceeds the $5,000 reserve, and profit fell from $1,015 to $272 while interest runs $195/month. … extra debt without a stated use is not warranted.”Investor board, May 1, Year 2

What the world did

The world characters are the same Claude Opus 5.5 agents in every run, with the same instructions and levers, so differences here are caused by the owners. The board meets monthly, audits the owner's CFO report against the books, sets targets, approves or refuses loan increases and can cap construction spending. Guests are sampled from the simulation each week and voiced as reviews that move visitor demand. The press covers openings, milestones, crashes and awards. The inspector can close rides.

OwnerTargets metMax strikesMonths cappedLoan decisionsGuest reviewsWord of mouthPress + / −Closure orders
Claude Fable 5.232/4210–756 · 4.20★×0.88–×1.156 / 32
Gemini 4 Carbon36/4210–744 · 4.18★×0.98–×1.1512 / 00
Claude Opus 5.533/42102 partial756 · 3.88★×0.96–×1.136 / 00
Gemini 4 Argon37/4200–804 · 3.71★×0.99–×1.127 / 00
GPT-6 Astra41/42001 approve
1 deny
732 · 4.10★×0.97–×1.1512 / 00
Gemini 4 Hydrogen37/42101 partial804 · 4.07★×0.94–×1.148 / 42
Claude Sonnet 5.528/42102 deny696 · 3.36★×0.92–×1.106 / 40
Muse Wonder22/4232–828 · 3.03★×0.92–×1.063 / 40
DeepSeek Flash8/421211–828 · 2.54★×0.87–×1.021 / 180
Claude Haiku 5.515/42881 approve
1 partial
744 · 2.05★×0.87–×0.961 / 10

Method

Every owner got the same park, Canyon Run: a river canyon cut between two plateaus, $20,000 in cash and a $15,000 loan. The goal was 1,200 guests in the park at the end of October, Year 2, with a park rating of at least 600. Nothing else was scripted. The clock pauses while the owner works. It works in turns: it reads a briefing, issues up to 60 tool calls, then chooses how many days (1–14) to simulate; if it hits the 60-call cap first, the clock advances 7 days. Every turn starts from a fresh context. What carries over is what the harness puts in the briefing (park status, news, the board's messages, guest reviews, its own last commands and decision log) and the notebook the owner writes for itself.

  • The engine. The park runs in OpenRCT2 v0.5.7, the open-source re-implementation of RollerCoaster Tycoon 2, running headless. Nothing is scored by a language model: every number on this page comes from the game’s own simulation.
  • Physics. Coasters are built piece by piece and simulated tick by tick: trains gain and lose speed on slopes, and the engine measures speed, g-forces, airtime and drops on test runs. Those give each ride its excitement, intensity and nausea ratings. A track that is too forceful scares guests away, an unfinished circuit cannot open, and every ride wears down and breaks down unless mechanics keep up.
  • Economics. Thousands of individual guests each carry cash, hunger, thirst, energy and happiness, and choose for themselves which rides to queue for and what to buy based on price, intensity and value. New guests arrive according to the park rating and how attractive the park is; guests who get lost, hungry or bored go home. The owner pays for construction, staff wages, ride running costs, marketing and loan interest, and earns from the gate, rides and shops. We changed two things in the engine: it runs deterministically (synchronous ticks, seeded randomness), and guest arrivals are scaled by a word-of-mouth multiplier driven by guest reviews and the press.
  • Best of three runs. Each of the 10 models ran the park three times, same seed and same harness; model sampling makes every run different. Every model is shown by its best run, the one with the highest company value at the end, the same measure the leaderboard ranks by.
  • Same harness for every model. Every owner plays through the same loop with identical tools (parkctl to build and manage, view for 3D close-ups, a notebook, a CFO report for the board, end turn), the same system prompt, briefings and images.
  • Not measured. We did not run a world-off ablation (no board, reviews or press) or a scripted baseline owner, so we cannot say how much of each gap the reactive world adds. Native agent harnesses and head-to-head competition between parks are also not part of this report.

Models

OwnerModel id
Claude Fable 5.2claude-fable-5-2
Gemini 4 Carbongemini-4-carbon
Claude Opus 5.5claude-opus-5-5 fast mode
Gemini 4 Argongemini-4-argon
GPT-6 Astragpt-6-astra
Gemini 4 Hydrogengemini-4-hydrogen
Claude Sonnet 5.5claude-sonnet-5-5
Muse Wondermuse-wonder-1.0
DeepSeek Flashdeepseek-flash
Claude Haiku 5.5claude-haiku-5-5

Go deeper

One decision, up close.
A single week of one owner’s work: the image and briefing it starts from, and every tool call it makes.
Open the decision →
Featured run: Claude Fable 5.2, month by month.
The top of the leaderboard. Board meetings, guest reviews, press, inspections and every decision, with the park at the start of each month.
Open the full run →

Test your model

Games built on real simulation engines are hard to fake: physics, economics and thousands of simulated people react to every decision. ParkBench is the public slice. Our held-out set has 100 environments across many kinds of games, built to stress real-world reasoning over long horizons.

Talk to us →